Grain-systems PNEG-1510 Uživatelský manuál

Procházejte online nebo si stáhněte Uživatelský manuál pro Kondicionéry Grain-systems PNEG-1510. Grain Systems PNEG-1510 User Manual Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 84
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
PNEG-1510
Top Dry 24', 30' and 36'
Manual Batch
Construction and Owners Manual
PNEG-1510
Date: 02-18-13
Zobrazit stránku 0
1 2 3 4 5 6 ... 83 84

Shrnutí obsahu

Strany 1 - Manual Batch

PNEG-1510Top Dry 24', 30' and 36' Manual BatchConstruction and Owner’s ManualPNEG-1510Date: 02-18-13

Strany 2

3. Foundation Requirements10 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchCircular Foundation FormFigure 3B Prepare the FoundationHa

Strany 3 - Contents

3. Foundation RequirementsPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 11Octagonal Foundation FormThere are two (2) styles of founda

Strany 4 - Table of Contents

3. Foundation Requirements12 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchInline Centrifugal Fan PadPlacement of the Fan Pad: GSI Tr

Strany 5 - Safety Guidelines

3. Foundation RequirementsPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 13Duct and Drying Fan Pad OptionalPlacement of the Duct Fan P

Strany 6 - CAUTION!

3. Foundation Requirements14 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchFrost Free Foundation Top Dry BinsDiameter of Bin: 24&apos

Strany 7 - DO NOT ENTER this bin!

3. Foundation RequirementsPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 15Frost Free PadNOTES:1. Foundation site should be well drain

Strany 8 - UNLOADING INSTRUCTIONS:

3. Foundation Requirements16 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchAnchor Bolt PlacementHaving poured and leveled the concret

Strany 9 - Scribe the Diameter

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch 174. HardwareHardware/Bolting RequirementsIMPORTANT: Do not tighten bolts to exceed the

Strany 10 - Carpenter’s level

4. Hardware18 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchRefer to Top Dry Tank Bolting Requirements for Complete Bolt Usage0.3125&

Strany 11 - Octagonal Foundation Form

4. HardwarePNEG-1510 Top Dry 24', 30' and 36' Manual Batch 19Refer to Top Dry Tank Bolting Requirements for Complete Bolt Usage (Contin

Strany 12 - Inline Centrifugal Fan Pad

2 PNEG-1510 Top Dry 24', 30' and 36' Manual Batch

Strany 13 - 3. Foundation Requirements

4. Hardware20 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchLocation of AccessoriesBelow is a typical Top Dry bin layout showing sugg

Strany 14

4. HardwarePNEG-1510 Top Dry 24', 30' and 36' Manual Batch 21Very ImportantFigure 4B Sheet Shown as Viewed from the Inside of BinAll 4.

Strany 15 - Frost Free Pad

22 PNEG-1510 Top Dry 24', 30' and 36' Manual Batch5. Sidewall ConstructionSidewall GaugesNOTE: Fan entrance sheets and plenum access do

Strany 16 - Anchor Bolt Placement

5. Sidewall ConstructionPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 23Sidewall Erection InstructionsBefore bolting the sidewall she

Strany 17 - Hardware/Bolting Requirements

5. Sidewall Construction24 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchCaulking DetailNOTE: The rope caulking is installed before e

Strany 18 - 4. Hardware

5. Sidewall ConstructionPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 25Sidewall Construction InstructionsFigure 5C Using correct siz

Strany 19 - Usage (Continued)

5. Sidewall Construction26 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchLifting Jacks and BracketsNOTE: The number of lifting jacks

Strany 20 - Location of Accessories

5. Sidewall ConstructionPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 27Lifting Jack UsageGive some thought before starting the bin o

Strany 21 - Very Important

28 PNEG-1510 Top Dry 24', 30' and 36' Manual Batch6. Stiffener DetailsStiffener GaugesNOTE: All Top Dry bin stiffeners are mounted on t

Strany 22 - Sidewall Gauges

6. Stiffener DetailsPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 29Outside StiffenersThe XX in the part numbers at the bottom will i

Strany 23 - 5. Sidewall Construction

Table of ContentsPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 3ContentsChapter 1 Safety ...

Strany 24 - Caulking Detail

6. Stiffener Details30 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchOutside Stiffeners (Continued)Figure 6A

Strany 25

6. Stiffener DetailsPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 31Top Stiffener Starting LocationRefer to Figure 6B, for proper loc

Strany 26 - Lifting Jacks and Brackets

6. Stiffener Details32 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchStiffener Installation and LocationWhen installing bottom stiffen

Strany 27 - Lifting Jack Usage

6. Stiffener DetailsPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 33Bolting Requirements Two (2) Stiffeners per Sidewall SheetAll bol

Strany 28 - Stiffener Gauges

6. Stiffener Details34 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchStiffener and Seam LocationsFigure 6E

Strany 29 - Outside Stiffeners

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch 357. “C” ChannelsStiffener to “C” Channel Bracket InstallationInstall the stiffeners on

Strany 30 - 6. Stiffener Details

7. “C” Channels36 PNEG-1510 Top Dry 24', 30' and 36' Manual Batch“C” Channel InstallationFasten the rolled “C” eave members to the wal

Strany 31

7. “C” ChannelsPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 37Center Collar AssemblyAdd channel braces and brace plates to center co

Strany 32

38 PNEG-1510 Top Dry 24', 30' and 36' Manual Batch8. InstallationRafter Installation and Floor Support Angle AttachmentWhen installing

Strany 33

8. InstallationPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 39Purlin Installation24' Intermediate PurlinCounting up from the lo

Strany 34 - Stiffener and Seam Locations

Table of Contents4 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchChapter 9 Assembly ...

Strany 35 - 7. “C” Channels

8. Installation40 PNEG-1510 Top Dry 24', 30' and 36' Manual Batch30' Intermediate PurlinThe upper purlins are bolted using 5/16&q

Strany 36 - 36' TD-100731

8. InstallationPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 4136' Intermediate PurlinThe upper purlins are bolted using 5/16&qu

Strany 37 - Center Collar Assembly

8. Installation42 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchDump Hopper InstallationPre-assemble the dump hoppers, dump brackets

Strany 38 - 36' TD-100740 TD-100741

8. InstallationPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 4324' Leveling Band Post InstallationInstall the leveling band post

Strany 39 - 24' Intermediate Purlin

8. Installation44 PNEG-1510 Top Dry 24', 30' and 36' Manual Batch30' Leveling Band Post InstallationInstall the leveling band pos

Strany 40 - 30' Intermediate Purlin

8. InstallationPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 4536' Leveling Band Post InstallationInstall the leveling band post

Strany 41 - 36' Intermediate Purlin

8. Installation46 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchFlashing Bolt InstallationInstall the eave flashing bolts (5/16"

Strany 42 - Floor Sheet Installation

8. InstallationPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 47Eave Flashing Installation (Continued)Figure 8L Eave Flashing SpliceTh

Strany 43 - 8. Installation

8. Installation48 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchOuter Dump ChutesBolt a angle dam (TD-100598) to each dump chute usin

Strany 44

8. InstallationPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 49Intermediate Dump ChutesInstall a 1/4" nut up each leg of (S-4748

Strany 45

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch 51. SafetySafety GuidelinesThis manual contains information that is important for you,

Strany 46 - Eave Flashing Installation

8. Installation50 PNEG-1510 Top Dry 24', 30' and 36' Manual Batch24' Leveling Band LocationPosition leveling bands as shown in Fi

Strany 47 - Eave Flashing Splice

8. InstallationPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 5130' Leveling Band LocationAdd leveling bands as shown in the rele

Strany 48 - Outer Dump Chutes

8. Installation52 PNEG-1510 Top Dry 24', 30' and 36' Manual Batch30' Leveling Band Locations (Continued)Outer Leveling BandsFigur

Strany 49 - Intermediate Dump Chutes

8. InstallationPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 5336' Leveling Band LocationAdd leveling bands as shown in the rele

Strany 50 - Outer Leveling Bands

8. Installation54 PNEG-1510 Top Dry 24', 30' and 36' Manual Batch36' Leveling Band Locations (Continued)Number 3 Set of Leveling

Strany 51 - Middle Leveling Bands

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch 559. AssemblyCenter Cone AssemblyBolt the sections together to form perforated cone as

Strany 52

9. Assembly56 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchRoof AssemblySpecial InstructionsSee roof installation manual located wit

Strany 53 - Inner Set of Leveling Bands

9. AssemblyPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 57Pulley AssemblyFinish assembling the center collar by adding the cross cha

Strany 54 - Outer Set of Leveling Bands

9. Assembly58 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchDump Chute Chain AssemblyAttach all dump chute chains directly to the lif

Strany 55 - Center Cone Installation

9. AssemblyPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 59Dump Chute Chain Assembly (Continued)Figure 9G Figure 9H NOTE: Field cut r

Strany 56 - Special Instructions

6 PNEG-1510 Top Dry 24', 30' and 36' Manual Batch2. DecalsRoof Damage Warning and DisclaimerExcessive vacuum (or pressure) may damage r

Strany 57 - Pulley Assembly

9. Assembly60 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchWinch AssemblyComplete erection of bin. Install winch as shown using 5/16

Strany 58 - Dump Chute Chain Assembly

9. AssemblyPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 61Fan Entrance SheetsFigure 9J 24'' through 36'' fansFig

Strany 59 - 9. Assembly

9. Assembly62 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchTop Dry Access Door Assembly (TD-100996)1. Assemble the Z-frames (TD-1009

Strany 60 - Winch Assembly

9. AssemblyPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 63Detailed Layout for Proper Location of PlatformsFigure 9M

Strany 61 - Fan Entrance Sheets

9. Assembly64 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchAccess Door Platform (TDP-5012)Before assembly of any platform, read the

Strany 62

9. AssemblyPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 65Large Platform Assembly for 42" FanBefore assembly of any platform, r

Strany 63

9. Assembly66 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchLarge Platform Assembly for 42" Fan (Continued)Figure 9P Ref # Part

Strany 64

9. AssemblyPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 67Large Platform Assembly (Continued) (for 1 fan systems or #2 fan on 2 fan

Strany 65

9. Assembly68 PNEG-1510 Top Dry 24', 30' and 36' Manual Batch42" Fan Diffuser Instructions and InstallationBolt the long side of

Strany 66

9. AssemblyPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 6942" Fan Diffuser Instructions and Installation (Continued)Attach fron

Strany 67

2. DecalsPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 7ATTENTION: The decal shown below should be present on the outside of the door

Strany 68

9. Assembly70 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchCross Over Platform Assembly (for use with stairs) (TDP-5013)Before assem

Strany 69

9. AssemblyPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 71Perforated Center BandDrill six (6) 3/8" diameter holes equally space

Strany 70

9. Assembly72 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchOptional Rotary Switch Roof LocationsFigure 9W Overhead View of Optional

Strany 71 - Perforated Center Band

9. AssemblyPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 73Optional Installation of Roof Mounted Level SwitchesDrill 2" diameter

Strany 72 - 24' 23-1/2"

9. Assembly74 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchOptional Installation of Wall Mounted Rotary SwitchesIMPORTANT: Wall moun

Strany 73

9. AssemblyPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 75Transition Installation (TR-4734)Before cutting the opening check that TR-

Strany 74

9. Assembly76 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchTransition Assembly (TR-4734)Figure 9AB Ref # Part # Description1 TR-4724

Strany 75

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch 7710. Accessories2 Ring Door Installation InstructionsBefore starting to install, be su

Strany 76 - Transition Assembly (TR-4734)

10. Accessories78 PNEG-1510 Top Dry 24', 30' and 36' Manual Batch2 Ring Door AssemblyFigure 10B

Strany 77 - 10. Accessories

10. AccessoriesPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 792 Ring Door Assembly Parts ListRef #Part #DescriptionQty12'-27&ap

Strany 78 - 2 Ring Door Assembly

2. Decals8 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchATTENTION: The decal shown below should be present on the outside of the doo

Strany 79

10. Accessories80 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchOptional Bin Step Assembly (WD-042)Figure 10C

Strany 80

10. AccessoriesPNEG-1510 Top Dry 24', 30' and 36' Manual Batch 81Base AngleOnce the door frame has been placed and secured, continue ad

Strany 81 - Base Stiffener Shim

82 PNEG-1510 Top Dry 24', 30' and 36' Manual BatchNOTES

Strany 82

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch 8311. WarrantyGSI Group, LLC Limited WarrantyThe GSI Group, LLC (“GSI”) warrants produc

Strany 83 - Conditions and Limitations:

This equipment shall be installed in accordance with the current installation codes and applicable regulations, which should be carefully followed in

Strany 84 - CN-304467

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch 93. Foundation RequirementsFoundation Requirements for Top Dry Bins (4.00" Top Dry

Komentáře k této Příručce

Žádné komentáře