Grain-systems PNEG-300 Uživatelský manuál

Procházejte online nebo si stáhněte Uživatelský manuál pro Kondicionéry Grain-systems PNEG-300. Grain Systems PNEG-300 User Manual Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 4
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
Date: 12-16-10
Instructions
1004 East Illinois Street • Assumption, IL 62510 • 1-217-226-4421
Page 1 of 4
Printed in the U.S.A.
Copyright © 2010 by GSI Group
www.gsiag.com
PNEG-300
PNEG-300
Rotary Switch Instructions
Installation of Roof Mounted Level Switches
Drill 2" diameter holes through roof panels at locations shown on Page 3. Use a mounting plate as a
pattern and drill four (4) 3/8" holes through roof panels at each switch location so the plate can be bolted to
the roof.
Attach flex-coupling to the power-pak. Apply teflon tape or pipe sealant (not included) to power-pak pipe
threads and thread power-pak into mounting plate coupling. Conduit opening in power-pak should be at
right angles to roof rib or face toward eave.
Caulk underside of mounting plate above and both sides of 2" hole. Bolt to roof panel.
Attach shaft extension according to Figure 2 and Figure 3 on Page 2. Use teflon tape or pipe sealant
(not included) on shaft guard (see Figure 2 and Figure 3 on Page 2 for lengths) and thread to underside
of mount plate coupling. Add 1/4" drilled coupling and paddle. (NOTE: Single vane paddle is used on LOW
level switch.)
Figure 1 Overflow Rotary Switch Assembly
Zobrazit stránku 0
1 2 3 4

Shrnutí obsahu

Strany 1 - Rotary Switch Instructions

Date: 12-16-10Instructions1004 East Illinois Street • Assumption, IL 62510 • 1-217-226-4421Page 1 of 4Printed in the U.S.A.Copyright © 2010 by GSI Gro

Strany 2

Page 2 of 4 PNEG-300Rotary Switch InstructionsFigure 2 High-Limit Rotary Switch AssemblyFigure 3 Low-Limit Rotary Switch Assembly

Strany 3

PNEG-300 Page 3 of 4Rotary Switch InstructionsFigure 4 NOTE: Attach the flex-coupling to the rotary switch power-pak, then thread the power-pak into t

Strany 4

Page 4 of 4 PNEG-300Rotary Switch InstructionsInstallation of Wall Mounted Level SwitchDrill 2" hole through wall at desired location. If bin is

Komentáře k této Příručce

Žádné komentáře